MAKE A MEME View Large Image Lot 9431-7: How to Save Five Weeks in Ship Construction. A crane swings the a hull section for a submarine chaser, possibly the PC-461-class, into place. The ship will be welded together before being righted for finishing touches and ...
View Original:Lot_9431-7.jpg (2082x1506)
Download: Original    Medium    Small Thumb
Courtesy of:www.flickr.com More Like This
Keywords: Lot 9431-7: How to Save Five Weeks in Ship Construction. A crane swings the a hull section for a submarine chaser, possibly the PC-461-class, into place. The ship will be welded together before being righted for finishing touches and addition of the superstructure, circa 1942. Office of War Information photograph. (10/2/2015). Lot 9431-7: How to Save Five Weeks in Ship Construction. A crane swings the a hull section for a submarine chaser, possibly the PC-461-class, into place. The ship will be welded together before being righted for finishing touches and addition of the superstructure, circa 1942. Office of War Information photograph. (10/2/2015).
Terms of Use   Search of the Day